Introduction Monitoring
Introduction:
Consequent upon restructuring of Central Water Engineering Services (Group A), the Monitoring Directorate was established at Nagpur on 14.03.1995 under Monitoring Central Organization, CWC, Nagpur. The Directorate is headed by the Director and supported with one Deputy Director, one Assistant Director and other staff at lower cadre.